| 7/30/2010 | Carlos Garcia | High School | Data Rooms |
| The technology data rooms at the gym and cafeteria locations need power on the ceiling for both internet and phone switches that are inside the mounted cabinets. Please have Gumi get with me for details. | Status: Pending
Print |
|
| 7/30/2010 | Stephanie Segura | Junior High | Cafeteria/bookroom |
| Metal plate for door needs to be replaced. | Status: Pending
Print |
|
| 7/26/2010 | Samaniego | Intermediate | BANOS HOMBRES |
| BANOS ENFRENTE EL EXTRACTOR NO FUNSIONA | Status: Pending
Print |
|
| 7/26/2010 | Samaniego | Intermediate | PACILLO |
| EN EL EDIFICIO QUE ERA INTERMEDIA ,EN CAMPO SUR;BALASTRAS EN EL PASILLO;1 POR LA SALIDA AL GYM,OTRA FRENTE A LOS BANOS | Status: Pending
Print |
|
| 7/22/2010 | Thelma Trevizo | Central Office | Athletic Office |
| Cabinets call off the wall and they need to be install back to the wall. Mr. Vranish has already ask why they had not being fix. | Status: Pending
Print |
|
| 7/21/2010 | Thelma Trevizo | Central Office | Tennis Courts |
| Mr. Cobos,
The equipment for the tennis courts are in my office so we can replace the the cranks and nets.
Thank you,
Mrs. Trevizo | Status: Pending
Print |
|
| 7/21/2010 | Thelma Trevizo | Intermediate | Tennis Court |
| Status: Pending
Print |
|
| 7/17/2010 | Rosario | Junior High | Jr.High Nueva |
| En la libreria esta descompuesta la perilla y no sirve.Por favor si la pueden ir a revisar. | Status: Pending
Print |
|
| 7/13/2010 | David Carrasco | Central Office | DEN weight room |
| I need a contraption welded together to hold two video cameras at the same time. I can provide a drawing when needed. It will basically be a "c" shaped design that sits on a camera tripod. | Status: Pending
Print |
|
| 7/13/2010 | David Carrasco | Central Office | Football field |
| Can I please have the football field marked accordingly, by Saturday July 30th, 2010? | Status: Pending
Print |
|
| 7/13/2010 | David Carrasco | Central Office | Football weightroom DEN |
| The door lock facing the field has been broken. Can it please be replaced? | Status: Pending
Print |
|
| 7/13/2010 | David Carrasco | Central Office | Football locker room |
| The door lock to gain access into the washroom is broken. I would rather have a functioning doorknob and a deadbolt installed, instead of the current padlock. | Status: Pending
Print |
|
| 7/10/2010 | Rosario | Central Office | La entrada al sotano |
| La entrada al sotano esta sin puerta aparte la ventana que se encuentra alguien puso una tabla para poder entrar. Gracias por su ayuda. | Status: Pending
Print |
|
| 7/10/2010 | rosario | Wellness Center | la clinica |
| El porton de la clinica no se puede abrir solo gira la llave necesitamos que la arreglen para poder serrar la puerta. gracias. | Status: Pending
Print |
|
| 7/1/2010 | Ms. Sanchez | Elementary | Principal Office |
| Add a light at Mr. Alcoset Office, please.
Thank You | Status: Pending
Print |
|
| 6/21/2010 | Rosario | Central Office | El freezer de la cafeteria de la Elementaria |
| Se ha estado teniendo problemas con El Freezer de la cafeteria de la Elementaria ha estado bajando hasta 000 y lo hemos estado revisando cada hora hasta que subio a -02 y horita esta a -03. | Status: Pending
Print |
|
| 6/15/2010 | Samaniego | Junior High | CAFETERIA |
| UNAS PAREDES NECESITAN ARREGLO(PARCHES),TIENEN AJUGERO | Status: Scheduled
Print |
|
| 6/7/2010 | Tony Perez | Elementary | Cafeteria |
| Mount fixtures (2) on wall in dinning room (Too high,ladder to small) Thanks. | Status: Scheduled
Print |
|
| 6/2/2010 | Teresa Bouton | Elementary | |
| Could you please put together one of the new kidney shaped tables in the EL storage and put it in room 117. Thanks | Status: Scheduled
Print |
|
| 6/2/2010 | Teresa Bouton | Elementary | |
| Could you please move the following furniture from my office to room 117 after July 15?
Desk, chair file cabinet, metal closet. Then please move the table and chairs to the teachers lounge of the old intermediate school. Thank you | Status: Scheduled
Print |
|
| 6/2/2010 | Teresa Bouton | Elementary | Computer Lab |
| Could you please move the bulletion board from my office into room 117. above the right hand coat hooks? After it's painted please. Thank you | Status: Scheduled
Print |
|
| 6/1/2010 | Delta Samaniego | Intermediate | Intermeidate gym |
| Boys locker room door won't close. | Status: Scheduled
Print |
|
| 5/27/2010 | Michelle Burris | Central Office | Portable-1 elementary |
| Air conditioner is not working. It is 82 degrees in the portable. Thanks Michelle Burris | Status: Scheduled
Print |
|
| 5/26/2010 | Tony Perez | Junior High | Cafeteria |
| The heating parts for the skillet are in.Request installation ASAP. 2 major events at the cafeteria. 5/27 Athletic Banquet, 6/3 End of Year Event. Need Skillet Operational...Thanks | Status: Scheduled
Print |
|
| 5/24/2010 | rosario | Elementary | la cerca |
| por favor prodrian ir alguien a arreglar la cerca que se encuentra cerca de los portables de la elementaria esta caida donde los ninos brincan por ahy gracias | Status: Scheduled
Print |
|
| 5/23/2010 | rosario | High School | el estacionamiento de arriba |
| varias de las luces no preeedieron las de en medio desde la high school nueva hasta la mitad solo se preendieron las k estan en la parte de la jr high | Status: Scheduled
Print |
|
| 5/21/2010 | Armida Zavala | High School | Old High School Boys Restroom |
| As per Lupe the janitor, all the framework of the stalls in boys restroom at old high school by Mr. Barrera's room 301, have been vandalized. Thank you | Status: Scheduled
Print |
|
| 5/20/2010 | Samaniego | Junior High | JANITO R |
| EN EL JANITOR ROOM DE LA PARTE DE ATRAS,EN EL EDIFICIO QUE ERA J.H.S.,ESTAN DOS MAQUINAS DE DAR BUFF,DESCOMPUESTAS. MOTOR QUEMADO | Status: Scheduled
Print |
|
| 5/18/2010 | Elvia | Hope Academy | |
| Assemble a computer desk | Status: Scheduled
Print |
|
| 5/18/2010 | Elvia | Central Office | Special Program |
| File cabinet needs to be assemble | Status: Scheduled
Print |
|
| 5/13/2010 | Samaniego | Junior High | BANO DE HOMBRES |
| POR EL LADO DE EL SALON DE ARTE;
LAS PAREDES DIVICION DE LOS SANITARIOS SE ESTA CALLENDO,CORRE PELIGRO,FAVOR DE REVISAR | Status: Scheduled
Print |
|
| 5/12/2010 | Rosie | Elementary | rm 107 |
| Ms. Butlers classroom air conditioner does not work. Please come by and check. | Status: Scheduled
Print |
|
| 5/8/2010 | trejo | Junior High | gym de la jr. high |
| Las luces de la parte de atraz y de los lados no se estan prendiendo y de La High School nueva se apagaron como a las 11:00pm y no se distingue bien. | Status: Scheduled
Print |
|
| 5/3/2010 | Tony Perez | High School | Cafeteria |
| Parts are in to repair DISHWASHER. We are spending $$'s $$'s in dishsoap because machine is not working properly. Important!! | Status: Scheduled
Print |
|
| 5/3/2010 | Tony Perez | High School | Cafeteria |
| Reference work order dated 4/12/10 (Food warmer) still not operating. Need these pieces of equipment repaired ASAP. Safety and Sanitation issues are going to occur. URGENT!!! | Status: Scheduled
Print |
|
| 4/28/2010 | Samaniego | High School | GIMNACIO |
| la ventana de enfrente ,vidrio quebrado | Status: Scheduled
Print |
|
| 4/19/2010 | Rocio Contreras | Elementary | Exit Door |
| The exit door next to Mrs. Marichu's class room needs to have the door knob checked. It will unlock from the outside even though it is locked. | Status: Scheduled
Print |
|
| 4/16/2010 | Montoya | High School | Rm 201 old high school |
| A/C not cooling | Status: Scheduled
Print |
|
| 4/15/2010 | Rosie | Elementary | in front of office |
| there is a leak and ceiling tile already missing also another leak going towards art room. Plus in room 119 antoher leak please come by and check it out asap. | Status: Scheduled
Print |
|
| 4/14/2010 | Adriana Cantu | Intermediate | Workroom |
| Severe water leak | Status: Scheduled
Print |
|
| 4/14/2010 | Adriana Cantu | Junior High | Portable 4 |
| Leak on the roof | Status: Scheduled
Print |
|
| 4/14/2010 | Adriana Cantu | Junior High | Portable 1 |
| One of the tiles in our ceiling caved in and lots of water with mud came pouring in all over the carpet! The water is now leaking through the next two tiles | Status: Scheduled
Print |
|
| 4/12/2010 | Rosie | Elementary | 117 |
| Ms. Juana Rodriguez room 117 air is not working blowing hot air please come by and fix. Student will be testing. Thank you for your prompt attention. | Status: In Progress
Print |
|
| 4/9/2010 | Lettunich | High School | old library |
| the signs outside as you turn toward the library that read"High School and Public Library" need to come down.
Also, the library has a leak and it shows through the ceiling tile. Thank you so much. | Status: Scheduled
Print |
|
| 4/9/2010 | Armida Zavala | High School | New High School |
| The door stop in the boys restroom by the cafetorium needs to be repaired. It came undone along with the anchors. | Status: Scheduled
Print |
|
| 4/7/2010 | Ramirez / Cramer | Hope Academy | classroom |
| Tiles are broken and need to be replaced. 7 are cracked or broken.
Thank You! | Status: Scheduled
Print |
|
| 3/16/2010 | rebeca trejo | Intermediate | gym |
| walls behind bleacher need to be painted over do to graffiti and also the girls restrooms. The wall infront of the water fountain and the boys dressing room has graffitti. Doors where opened for the tennis team to practice. | Status: Scheduled
Print |
|
| 2/22/2010 | cody burris | Intermediate | football field |
| Rigo,
When you get a chance can you fix the grill that we used for the football games and get it going. And then can you store it a the high school inside the Concession stand? Thanks | Status: Scheduled
Print |
|
| 11/13/2007 | Cody Burris | Central Office | Intermediate Gym |
| The bleachers in the gym will not move on the end near the consession stand. It seems like the rollers are broken. | Status: Scheduled
Print |
|